Kappa value - quality
Construction Quality Planning Guide, Draft for Consultation, Published by the Construction Innovation Hub in May 2020, suggests that Kappa Value: ‘…are an output of one of the tools used within the CQP (Construction Quality Plan), called MSA (Measurement Systems Analysis). Kappa values can be determined for any measurement system the results of which are not numeric but binary i.e. ‘good or bad’/’pass or fail’. These are measurement systems that may be heavily dependent on operator input and may carry a high degree subjectivity and reproducibility error for example: checking a wall colour is correct to the specification of a client through only visual means. Kappa values are compared against predefined thresholds, to determine whether the quality of the data output from different operators within the supply chain is satisfactory.
See also : Alternative meanings of Kappa Value.
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Building Safety Act implementation in Wales
CIAT to host industry panel on 26 June.
New and updated CLC building safety guidance.
New UK National Buildings Database.
Building Safety Wiki Interviews
Chief executive of the British Woodworking Federation.
Planning condition discharge in England and Wales
A brief explanation from a building compliance expert, with further links.
Overheating guidance and tools for building designers
Guidance for dealing with element of building fabric control that have increasing importance.
Shading for housing, a design guide
From the Good Homes Alliance and British Blind and Shutter Association.
UK Standard Skills Classification (SSC)
A shared framework for describing skills needs.
Social media ban consultation comes to close
CIOB urges UK Government to consider social media’s role in careers guidance in ban debate.
The latest of eight Skills England apprenticeship units
The addition of battery manufacturing welcomed by ECA with a warning about the risks of fast-tracked apprenticeship units.
Building Control Independent Panel final report
A precis of a key report led by Dame Hackitt with full recommendations and link to the government response.